ANALYSIS OF RISK FACTORS LEADING TO DELAY IN ROAD ENGINEERING CONSTRUCTION PROJECTS IN RWANDA

Authors

  • Bigirimana Theoneste lanzhou jiaotong university, Lanzhou, China. Author
  • Wang XU lanzhou jiaotong university, Lanzhou, China. Author
  • Li Renjie lanzhou jiaotong university, Lanzhou, China. Author
  • Kundwa Marie Judith lanzhou jiaotong university, Lanzhou, China. Author

Keywords:

Risk, Delay, Risk Management, Delay Effects, Mitigation Measures, RII

Abstract

Road construction projects in Rwanda are exposed to a wide variety of risk factors causing delay including change of scope, right of way, poor project management, adverse weather condition, construction and environmental related risks. The very crucial concern of the project management is to keep and attain the project objectives through minimizing and exposing risks and uncertainties that impede the successful project delivery. This research deeply analyses the top risk factors leading to road engineering construction project delays in Rwanda, their effects to the projects, and possible mitigation measures. By the use of Relative Importance Index (RII), data from respondents were analyzed and ranked. Change of scope, Sponsor/Client’s financial and payment difficulties, land acquisition, poor project management, and poor planning and scheduling are on top of causes; Time overrun, cost overrun and negative social impact are the most effects resulted from delay; measures like: having a collaborative and integrated team, Increased communication and transparency, and The use of BIM (building information modelling) were ranked the top mitigation measures to the risks of delay. A case study was done to one road Construction Company to examine delay in the projects carried out in 10 years. The research concluded that risk management must be the chief aim of parties involved in the projects execution and proper risk plan has to be designed and taken. It is therefore recommended to identify, assess and mitigate the risks of delay from the very early stage of inception before carrying out the project.

References

73:2009, I. (. (2009). Risk management, Vocabulary. Switzerland: ISO.

Aiyetan, O. S. (2008). Influences on construction project delivery time performance. In the proceeding of Third Built Environment conference. Cape Town, South Africa.

Alaghbari, W. K. (2007). The significant factors causing delay ofbuilding construction projects in Malaysia. Engineering Construction and Architectural Management Journal, 14(2), 192 – 206.

Al-Tabtabai, H. M. (2002). Causes for Delays in Construction Projects in Kuwait. Engineering i. Journal of the University, 15, 19 – 37.

Ashley, D. D. (2006). Guide to risk assessment and allocation for highway construction management. Washington, DC,4-17: FHA, International Technology Scanning Program. Office of international program, FHA.

Assaf, S. A.-K.-H. (1995). Causes of Delay in Large Building Construction Projects. Journal of Management in Engineering, 11(2), 45 – 50.

Cavignac. (2019, august o6). Managing risk in a construction company [Internet]. Retrieved from Construction Business Owner 2009: http://www.constructionbusinessowner.com/topics/insurance/constructioninsurance/ managing-risk-construction-company

Challal, A. &. (2012). Identification of the Causes of Deadline Slippage in Construction Projects: State of the Art and Application. Journal of Service Science and Management, 5, 151 – 159.

Cooper, D. F. (2005). Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements. England: John Wiley & Sons Ltd.

Douglas, H. (2009). The Failure of Risk Management: Why it’s Broken and How to Fix It. New York: J. Wiley & Sons.

Elkington P., S. C. (2002). Managing Project Risks: A Case Study from the Utilities Sector. International journal of Project Management, 20, 49-57.

Institute, P. M. (2008). Guide to the project management body of knowledge (PMBOK® Guide). 4th ed. Newtown Square: Project Management Institute.

Institute. P. M. (2007). Construction extension to the PMBOK® Guide. 3rd ed. Newtown Square: Project Management Institute.

Kamanga, M. J. (2013). Causes of Delay in Road Construction Projects in Malawi. Journal of the South African Institution of Civil Engineering, 55(3), 79 – 85.

Kholif, W. H. (2013). Analysis of Time and Cost Overruns in Educational Building Projects in Egypt. International Journal of Engineering and Technical Research, 1(10).

Kikwasi, G. (2012). Causes and effects of delays and disruptions in construction projects in Tanzania. Australasian Journal of Construction Economics and Building, Conference Series, 1 (2) 52-59.

Lo, T. Y. (2006). Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management, 132(6) 636-49.

Mark W, C. P. (2004). Project Risk Identification and Management. AACE Internat. Trans., INT.01, 1-5.

Memon, A. H. (2012). Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia. International Journal of Advances in Applied Sciences, 1(1), 45 – 52.

Nieto-Morote A., R.-V. F. (2011). A Fuzzy Approach to Construction Project Risk Assessment. International journal of project management, 29, 220-231.

Noulmanee A, W. J. (2006). Internal causes of delays in highway construction projects in Thailand. www.ait.c1et.com. Retrieved from www.ait.c1et.com

Patil, S. K. (2013). Causes of Delay in Indian Transportation Infrastructure Projects. International Journal of Research in Engineering and Technology, 02(11), 71 80.

Perera BAKS, D. I. (2009). Risk management in road construction: the case of Sri Lanka. Int J St Prop Manage, 13(2):87–102.

Pickavance, K. (2005). Delay and disruption in construction contracts. Informa Legal Publishing UK, 3rd edition.

Profession, I. o. (2005). Risk analysis and management for projects (RAMP). 2nd ed. Institution of Civil Engineers and the Actuarial Profession. London: London: Thomas Telford Ltd.

Raz Z, S. A. (2002). Risk management, project success and technological uncertainty. R&D Management, 32(2):101–109.

Sambasivan, M. a. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25 (2007) 517–526.

Sweis, G. J. (2013). Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan. International Journal of Business and Management, 8(23), 120 – 129.

Syed M. Ahmed, S. A. (2002). fiu. Retrieved from moss school of construction ,infrastructure and sustainability: www.cm.fiu.edu/pdfs/Research-Reports

Syed M. Ahmed, S. A. (n.d.). Construction Delays in Florida.

Wang SQ, D. M. (2004). Risk management framework for construction projects in developing countries. Construction Management Economics, 22(3):237–252.

Wong, K. &. (2012). A Study of the Factors effecting Construction Time in Western Australia. Scientific Research and Essays, 7(40), 3390 – 3398.

Zou PXW, Z. G. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6):601–614.

Zou PXW, Z. G. (2007). Wang J. Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6):601–614.

Zou, P. X. (2006). Identifying key risks in construction projects: life cycle and stakeholder perspectives. Retrieved from www.prress.net/papers/Zou_risks-construction

Zou, P. X. (n.d.). Identifying key risks in construction projects: life cycle and stakeholder perspectives. Retrieved from www.prress.net/papers/Zou_risks-constru

Downloads

Published

2020-03-25

How to Cite

ANALYSIS OF RISK FACTORS LEADING TO DELAY IN ROAD ENGINEERING CONSTRUCTION PROJECTS IN RWANDA. (2020). INTERNATIONAL JOURNAL OF CONSTRUCTION ENGINEERING (IJCE), 3(1), 1-14. https://mylib.in/index.php/IJCE/article/view/IJCE_03_01_001