“DELAY RISK ANALYSIS OF PT ADARO INDONESIA CONSTRUCTION PROJECT - CASE STUDY ON PT ADARO INDONESIA TABALONG WATER AND MUD INSTALLATION PROJECT” (2021) INTERNATIONAL JOURNAL OF CONSTRUCTION ENGINEERING (IJCE), 4(1), pp. 16–26. Available at: https://mylib.in/index.php/IJCE/article/view/IJCE_04_01_002 (Accessed: 5 February 2025).